CURRENT PROJECTS
WATER SYSTEM IMPROVEMENTS
CITY OF CLARK, SD
Installation of new 6" watermain pipe, valves, fittings and other appurtenances.
Contract Amount: $4,682,986.00
Substantial Completion: 7/11/2025
Engineer: Helms & Associates, Aberdeen, SD
23RD AVE LIFT STATION
CITY OF MITCHELL, SD
Furnish and install new wet well and valve vault. Remove and dispose of existing lift station.
Contract Amount: $1,547,214.00
Substantial Completion: 6/15/2025
Engineer: SPN & Associates, Mitchell, SD
SANITARY SEWER COLLECTION SYSTEM IMPROVEMENTS PHASE 2
CITY OF AURORA, SD
Furnish and install approximately 5150' of gravity sewer pipe w/ 20 sanitary sewer manholes.
Contract Amount: $3,683,299.58
Substantial Completion: 11/1/2024
Engineer: Banner Associates, Brookings, SD
RIDGEVIEW ON FOSTER IMPROVEMENTS PHASE 1 & 2
MITCHELL AREA DEVELOPMENT CORPORATION
Installation of water, sanitary, and storm sewer, along with excavation, concrete and paving.
Contract Amount: $2,419,094.13
Substantial Completion: 7/16/2025
Engineer: SPN & Associates, Mitchell, SD
CAST IRON WATERMAIN REPLACEMENT
WATERTOWN MUNICIPAL UTILITIES
Removal and replacement of old cast iron pipe with new PVC pipe, valves, fittings, and other appurtenances.
Contract Amount: $4,292,148.80
Substantial Completion: 9/18/2026
Engineer: AE2S, Sioux Falls, SD
3RD STREET WATERLINE PROJECT
CITY OF SUNDANCE, WY
2100' of 10" and 2600' of 8" PVC watermain installation along with fittings, valves, and appurtenances.
Contract Amount: $2,353,770.00
Substantial Completion: 10/9/2026
Engineer: Trihydro Corporation, Lander, WY
EAST WATERMAIN
(NEAR TRENT, SD)
SHARED RESOURCES
36,000' of 20" PVC watermain installed by open trench excavation and directional drilling. Includes installation of fittings and appurtenances.
Contract Amount: $5,833,056.20
Substantial Completion: 9/25/2026
Engineer: Banner Associates, Brookings, SD
CALUMET AVE AREA & 2ND ST SE UTILITIES
CITY OF DE SMET, SD
Installation of water, sewer, and storm, street reconstruction, concrete, asphalt paving, and sanitary sewer lining.
Contract Amount: $5,633,771.05
Substantial Completion: 10/31/2026
Engineer: IMEG Corp, Aberdeen, SD
LAKE POINSETT LIFT STATION REHABILITATION - 2023
LAKE POINSETT SANITARY DISTRICT
Dewater, reline, remove and replace pumps, controls, etc. on multiple lift stations.
Contract Amount: $853,550.00
Substantial Completion: 5/16/2025
Engineer: Banner Associates, Brookings, SD
OHLMAN LIFT STATION
CITY OF MITCHELL, SD
Furnish and install new wet well and valve vault. Remove and dispose of existing lift station.
Contract Amount: $1,239,223.50
Substantial Completion: 10/15/2025
Engineer: SPN & Associates, Mitchell, SD
NORTH HARMON SANITARY SEWER OUTFALL
CITY OF MITCHELL, SD
Furnish and install approx. 2700' of 4", 3500' of 8", 6500' of 12" PVC Sewer Main, and 29 manholes.
Contract Amount: $3,229,884.25
Substantial Completion: 9/15/2025
Engineer: SPN & Associates, Mitchell, SD
MANCHESTER AREA PIPELINE IMPROVEMENTS, PHASE 1
KINGBROOK RURAL WATER SYSTEM
Furnish and install approximately 3700' of 8" PVC water main.
Contract Amount: $793,900.00
Substantial Completion: 10/31/2024
Engineer: DGR Engineering, Rock Rapids, IA
VISTA GRANDE SEWER
CITY OF PINE HAVEN, WY
Installation of grinder pump station, gravity sewer main, manholes and other appurtenances.
Contract Amount: $243,818.50
Substantial Completion: 7/1/2025
Engineer: HDR Engineering, Gillette, WY
DEADWOOD WATER SUPPLY LINE REPLACEMENT
CITY OF LEAD, SD
Installation of approximately 2200' of 8" PVC watermain including fittings, valves, pressure reducing valve, and hydrants.
Contract Amount: $505,722.25
Substantial Completion: 6/1/2025
Engineer: Interstate Engineering, Spearfish, SD
PHASE 1 INFRASTRUCTURE IMPROVEMENTS
CITY OF BRYANT, SD
Installation of water, sewer, and storm, along with a new lift station and valve vault. Also includes concrete and asphalt paving
Contract Amount: $1,486,300.50
Substantial Completion: 10/31/2025
Engineer: IMEG Corp, Aberdeen, SD