Kingbrook Rural Water System Expansion

  • Halme Inc. is the prime contractor on this $9.6 million project for Kingbrook Rural Water System.  There is 178 miles of rural water pipe to install ranging in sizes from 1 1/2" to 16", along with 240 services.  The project also includes boring under existing roads.  The project engineer is DGR Engineering.  Efraimson Electric of Bryant, SD and Basin Construction of Hayti, SD will be subcontractors on this project.

SDDOT Madison Hwy 34 Urban Reconstruction Project

  • Halme Inc. is a subcontractor to D&G Concrete Construction, Inc. on this $2.1 million project for the SDDOT.  Halme's portion of the contract is to remove and replace watermain, sanitary and storm sewer along the length of the project.  Watermain pipe sizes range from 4" to 10"; sanitary sewer pipe sizes range from 6" to 18"; and storm sewer pipe sizes range from 18" to 54".  Halme will also be utilizing GPS on their equipment to provide precise pipe depth and grade control.

Garfield Dairy

  • Halme Inc. is a subcontractor to Riverview, LLP on this $4.6 million project.  Halme will be performing all of the site work, and will be utilizing their GPS to provide precise site prep.  With retention basins, a large holding barn, milk parlor, feed pad and more, there will be over 750,000 cubic yards of material to move.

Lake Norden Wellfield and Raw Water Transmission

  • Halme Inc. is the prime contractor on this project for the City of Lake Norden.  There is approximately 7,800 lineal feet of 10" water main to be installed, along with the construction of three new wells and multiple directionally drilled road and stream crossings.  Banner Associates are the engineers on this $553,000 project.  Efraimson Electric of Bryant, SD, Kaiser Well Drilling of Lake Norden, SD and Guardrail Enterprises of Chancellor, SD are subcontractors on this project.

Bryant Area Commercial Development - Phase 1 (Lee Street)

  • Halme Inc. is the prime contractor on this $438,000 project for the City of Bryant.  Halme will be rebuilding approximately 1,200 feet of street, and installing approximately 1,165 lineal feet of 8" sanitary sewer main and 1,790 lineal feet of 6" water main.  The engineer on this project is Clark Engineering.

Clark Rural Water System - Willow Lake and Bradley Improvements

  • Halme Inc. is the prime contractor on this $1.5 million for Clark Rural Water System.  There is approximately 11.5 miles of 6" water main, 6 miles of 8" water main and approximately 1 mile of 10" water main to be installed.  The project also includes directionally drilling under existing roads and streams.  The project engineer is Banner Associates.  Efraimson Electric of Bryant, SD and Guardrail Enterprises of Chancellor, SD are subcontractors on this project.

Current Projects