EAST 5TH AVENUE RECONSTRUCTION
CITY OF MITCHELL

Reconstruction of East 5th Avenue from North Burr Street to Foster Street, including pavement, base course, curb and gutter, sidewalks, storm sewer, sanitary sewer, watermain and utility services.​

​

Contract Amount:            $2,209,458.28

Substantial Completion:  11/1/2026

Engineer:                           Brosz Engineering Inc.

JOINT WELL FIELD EXPANSION
JOINT WELL FIELD, INC.

Construction of two well-meter buildings and approximately 1.5 miles of raw-water pipeline connecting Wells 11 and 13 to the treatment plant, including fittings, valves, hydrants, tie-ins, building systems and associated site work.​

​

Contract Amount:            $1,377,300.00

Substantial Completion:  6/30/2027

Engineer:                           DGR Engineering

PHASE IIA INFRASTRUCTURE IMPROVEMENTS
CITY OF BRYANT

Replacement of approximately 1,800 feet of watermain and 1,900 feet of sanitary sewer along Prospect Street and 2nd Avenue, including hydrants, service reconnections, manholes, and aggregate base.​

​

Contract Amount:            $1,197,988.45

Substantial Completion:  6/1/2027

Engineer:                          IMEG Consultants Corporation

CALVIN PARK LIFT STATION AND FORCEMAIN
CITY OF WATERTOWN

Installation of a lift station and sanitary forcemain from 23rd Street SE to the Watertown Waste Treatment Plant, including three stream crossings, trenchless construction and connection to an existing structure.​

​

Contract Amount:            $1,611,054.85

Substantial Completion:  10/31/2027

Engineer:                          Infrastructure Design Group, Inc.

BETHANY LIFT STATION IMPROVEMENTS
CITY OF BRANDON

Reconstruction of the Bethany Lift Station, including replacement pumps, station piping and controls, standby generation, bypass pumping, valve removal, an air-release valve and structure, and related electrical work.​

​

Contract Amount:            $399,395.00

Substantial Completion:  7/30/2027

Engineer:                          DGR Engineering

HIDDEN VALLEY SANITARY SEWER IMPROVEMENTS
CITY OF GILLETTE

Replacement of approximately 2,548 feet of sanitary sewer and reconnection of approximately 970 feet of services, with storm-drain improvements and pavement restoration. Awarded Alternate #1 adds sewer and service work.​

​

Contract Amount:            $1,154,643.35

Substantial Completion:  1/15/2027

Engineer:                          KLJ Engineering

NEMO ROAD STRUCTURE REPLACEMENTS
LAWRENCE COUNTY

Replacement of the Nemo Road structures and grading of their approaches​

​

Contract Amount:            $1,837,698.25

Substantial Completion:  11/26/2027

Engineer:                          Brosz Engineering, Inc.

OACOMA DOWNTOWN LIFT STATION REPLACEMENT
TOWN OF OACOMA

Replacement of the downtown lift station in Oacoma, South Dakota​

​

Contract Amount:            $563,000.00

Substantial Completion:  2/19/2027

Engineer:                           Banner Associates, Inc.

4TH STREET W & HIGHLAND BOULEVARD RECONSTRUCTION
CITY OF WATERTOWN

Street reconstruction including milling and removals, excavation, aggregate layers, asphalt paving, concrete curb and gutter, sidewalks, approaches, accessible warning panels, a manhole adjustment, erosion controls and restoration.​

​

Contract Amount:            $248,173.90

Substantial Completion:  10/2/2026

Engineer:                           City of Watertown, Watertown, SD

WATER MAIN TO WASTEWATER PLANT
BROOKINGS MUNICIPAL UTILITIES

Installation of approximately 3,000 feet of 8-inch watermain to the wastewater plant, including bedding, valves, fittings, fire hydrants, dewatering, traffic and erosion controls, agricultural-field restoration and minor road and ditch restoration.​

​

Contract Amount:            $475,944.60

Substantial Completion:  10/2/2026

Engineer:                          Brookings Municipal Utilities, Brookings, SD

WATER SYSTEM IMPROVEMENTS, PHASE II
TOWN OF HENRY

Installation of watermains, valves, curb stops, services and fire hydrants, together with a 60,000-gallon storage tank and pump house, including street, curb and gutter, gravel and sidewalk restoration.​

​

Contract Amount:            $1,745,387.00

Substantial Completion:  5/14/2027

Engineer:                          Helms & Associates

PRONGHORN INDUSTRIAL PARK SANITARY SEWER LIFT STATION
CAMPBELL COUNTY BOARD OF COMMISSIONERS

Construction of the industrial park’s sanitary sewer lift station, including required labor, materials, equipment and services, coordinated with the owner-provided packaged station.​

​

Contract Amount:            $1,091,939.00

Substantial Completion:  11/30/2026

Engineer:                          HDR Engineering

SOUTH STREET RECONSTRUCTION BLOCK 17 ALLEY TO WEST BLVD
CITY OF RAPID CITY

Roadway reconstruction including surfacing, curb and gutter, sidewalks, driveway approaches, watermain and services, storm drainage, underdrains, traffic control and restoration.​

​

Contract Amount:            $865,813.70

Substantial Completion:  11/20/2026

Engineer:                          Advanced Design Engineering and Surveying

MAITLAND ROAD STRUCTURE REPLACEMENT

Remove and replace existing bridge structure with new precast box culvert.  Also includes final approach grading.​

​

Contract Amount:            $633,798.60

Substantial Completion:  11/28/2026

Engineer:                           Brosz Engineering, Inc.